Green Star FAQs
FAQ F-00354
Correction for the Metering criteria in the Verification and Handover credit from Green Star Buildings v1
Correction for the Metering criteria in the Verification and Handover credit from Green Star Buildings v1
The GBCA clarifies for the Metering criteria in the Verification and Handover credit from Green Star Buildings v1, where the building's GFA is smaller than 1000m2, specialist equipment with a maximum power consumption of 100kW, not 100kWh/year, will need to be metered separately.
Rating Tools
This FAQ is related to the following Rating Tools, Categories or Credits:
- Green Star Buildings v1 / Responsible / 3 Verification and Handover
Disclaimer
When used on Green Star projects, make sure to:
These FAQs are:
- provided as additional technical assistance for Green Star users.
- optional and free to use on Green Star projects.
When used on Green Star projects, make sure to:
- state the FAQ number on the Submission Template.
- click on "Download" to save the FAQ.
- include the PDF in the submission.
The GBCA reserves the right to add or remove FAQ at our discretion.
Have more questions?
Submit a question by selecting an option below:
© Copyright Green Building Council of Australia 2024 | ABN 43 100 789 937 |
Terms & Conditions |
Privacy Policy