Green Star FAQs


FAQ F-00238
Is there an alternative pathway for projects to target Credit 15B.2.3 Domestic Hot Water?

Yes.

Projects may target 2 points under 15B.2.3 Domestic Hot Water from Green Star - Design & As Built by using an electric heat pump with a minimum COP of 3.5 on the condition that the heat pump will be powered by 100% renewable energy (on-site or off-site). 

 

 

 





Rating Tools

This FAQ is related to the following Rating Tools, Categories or Credits:

  • Green Star - Design & As Built v1 / Energy
  • Green Star - Design & As Built v1.1 / Energy
  • Green Star - Design & As Built v1.2 / Energy
  • Green Star - Design & As Built v1.3 / Energy


Disclaimer

These FAQs are:

  • provided as additional technical assistance for Green Star users.
  • optional and free to use on Green Star projects.

When used on Green Star projects, make sure to:
  • state the FAQ number on the Submission Template.
  • click on "Download" to save the FAQ.
  • include the PDF in the submission.

The GBCA reserves the right to add or remove FAQ at our discretion.





Have more questions?

Submit a question by selecting an option below: